02 · Planned infrastructure
Proprietary Launch
TATC is evaluating a proprietary data centre concept for its next infrastructure stage. The site-planning sketch identifies candidate building and support areas.
Planning snapshot
These are roadmap intentions, not an operational-facility specification.
Roadmap stage
02 · Planned
Power goal
7.5 MW · Target
Indicative milestone
February 2027
Site concept
Workshop and support areas
Preliminary site layout
The diagram below is a simplified public overview adapted from the supplied planning sketch. It shows proposed spatial relationships, not measured dimensions or a final engineering design.
Power planning
7.5 MW is the project's planned power target. The final power scope and technical configuration will be confirmed through utility coordination and detailed engineering design.
Roadmap targets are subject to financing, permits, power availability, vendor allocation and final engineering design.