02 · Planned infrastructure
TATC is evaluating a proprietary data centre concept for a future infrastructure stage. In this planned model, TATC would own and operate both the facility and the GPU equipment, while customers would continue to rent dedicated servers for remote access. The site-planning sketch identifies candidate building and support areas.
This planning snapshot outlines the proposed facility concept and its next design steps.
Roadmap stage
02 · Planned
Power goal
7.5 MW · Target
Indicative milestone
February 2027
Site concept
Workshop and support areas
The diagram below is a simplified public overview adapted from the supplied planning sketch. It shows proposed spatial relationships, not measured dimensions or a final engineering design.
7.5 MW is the project's planned power target. The final power scope and technical configuration will be confirmed through utility coordination and detailed engineering design.
Roadmap targets are subject to financing, permits, power availability, vendor allocation and final engineering design.