Proprietary Launch

TATC is evaluating a proprietary data centre concept for its next infrastructure stage. The site-planning sketch identifies candidate building and support areas.

Planning snapshot

These are roadmap intentions, not an operational-facility specification.

Roadmap stage

02 · Planned

Power goal

7.5 MW · Target

Indicative milestone

February 2027

Site concept

Workshop and support areas

Preliminary site layout

The diagram below is a simplified public overview adapted from the supplied planning sketch. It shows proposed spatial relationships, not measured dimensions or a final engineering design.

Candidate power areaFlexible support zoneOffice buildingMain workshopYardSecondary workshop
Illustrative planning diagram · not to scale. Building uses, equipment positions and power design remain subject to confirmation.

Power planning

7.5 MW is the project's planned power target. The final power scope and technical configuration will be confirmed through utility coordination and detailed engineering design.

Roadmap targets are subject to financing, permits, power availability, vendor allocation and final engineering design.